Access 11,520 building permits issued in West Richland, Washington through a single REST API. Refreshed daily from the official West Richland open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in West Richland.
Most active contractors by permit volume in West Richland.
The 10 most recent permits issued in West Richland, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | MECR-000548-2026 | 1804 Elmwood | HVAC | Install Air Handler and Heat Pump |
| 2026-08-05 | MECR-000546-2026 | 527 41st | HVAC | Air Handler and Heat Pump |
| 2026-08-04 | BLDR-000544-2026 | 6455 Polaris | Roofing | Re-roof |
| 2026-08-04 | MECR-000543-2026 | 3700 Andalusian | Mechanical | Change out existing LP fireplace & exhaust system |
| 2026-08-03 | BLDR-000540-2026 | 5604 Maui | Roofing | Roof replacement with GAF Timberline shingles |
| 2026-08-03 | BLDR-000541-2026 | 3802 Lattin | Roofing | Remove existing roof and install GAF Timberline shingles |
| 2026-07-30 | BLDR-000521-2026 | 7981 Remmel | New construction | New SFR-The Heights at Red Mountain Ranch Phases 6 & 7, Lot 299-Main level 127... |
| 2026-07-30 | BLDR-000522-2026 | 250 Tatoosh | New construction | New single family residence 2292 sqft with garage |
| 2026-07-29 | BLDR-000536-2026 | 3480 Northlake | Other | Outdoor patio pergola installation-650 sf aluminum pergola with opening louvers. |
| 2026-07-29 | BLDC-000537-2026 | 1400 Bombing Range | Interior remodel | Converting a car wash into a coffee shop. |
Query West Richland, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all West Richland permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=West%20Richland&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official West Richland open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for West Richland, Washington was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter West Richland permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in West Richland, Washington is 7 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key