Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Washington

Building Permits in Seattle Electrical, Washington

PermitStack indexes 498,516 building permits issued in Seattle Electrical, Washington, with 25,880 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

498,516
Total permits
25,880
Last 12 months
2,214
Last 30 days
-8%
vs same period prior year
Aug 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
21,506
HVAC
3,544
Solar
598
EV charger
85
Battery
78
Roofing
69

Permit data by trade in Seattle Electrical

Drill into the most common permit categories in Seattle Electrical.

Top contractors in Seattle Electrical

Most active contractors by permit volume in Seattle Electrical.

Most recent permits

The 10 most recent permits issued in Seattle Electrical, Washington. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-057156725-EL5613 KENSINGTON PL NHVACHeat pump circuit
2026-08-057156777-EL4017 EVANSTON AVE NElectricalnew range circuit and new circuit for hood fan (panel in basement)
2026-08-057156715-EL325 9TH AVEElectrical1WH 224 & 226 X-Ray Renovation
2026-08-057156720-EL5537 35TH AVE NEElectricalUfer new construction sfr
2026-08-057156764-EL701 PIKE STElectrical21620 - Oppenheimer suites 2100 and 2125A - Add alter lighting, switches, outlets.
2026-08-057156769-EL1513 NE 90TH STHVAC(1) 30amp HVAC circuit & 1 service outlet
2026-08-057156653-EL1253 N 143RD STElectrical1500sqft rewire plus panel upgrading
2026-08-057156694-EL6502 29TH AVE NEHVACnew circuit & outlet for mini split
2026-08-057156716-EL2050 NW 64TH STElectricalReplace Panel with same sized panel but more spaces due to existing panel not havi...
2026-08-057156778-EL1959 NE PACIFIC STElectrical26D5E30413 - UWM - ML - Panel Upgrades PH2

Access Seattle Electrical permit data via API

Query Seattle Electrical, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Seattle Electrical permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Seattle%20Electrical&state=WA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Seattle Electrical permit data?

We ingest data directly from the official Seattle Electrical open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Seattle Electrical data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Seattle Electrical, Washington was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Seattle Electrical permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Seattle Electrical permits interactively. Sign up for a free API key to get started.

Can I export Seattle Electrical permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Seattle Electrical building permit take to issue?

The median time from permit filing to issuance in Seattle Electrical, Washington is 13 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Seattle Electrical permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key