Search Coverage Alerts Property History Solar & Energy Solar Permit Data Real Estate Insurance Contractors Pricing Blog API Docs Sign In Get API Key

Building Permits in Bellevue, Washington

PermitStack indexes 436,119 building permits issued in Bellevue, Washington, with 18,434 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

436,119
Total permits
18,434
Last 12 months
439
Last 30 days
-82%
vs same period prior year
Jun 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
3,812
HVAC
2,487
Plumbing
1,852
Interior remodel
1,050
EV charger
417
Renovation
254
Solar
232
Mechanical
216
Roofing
175
Fire alarm
100

Most recent permits

The 10 most recent permits issued in Bellevue, Washington. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-06-0526 113755 BF5533 174th Pl SEElectricalA Single Family Residential Alteration to Existing Structure Electrical Project In...
2026-06-0526 113751 BF325 145th Pl SE - Lot 27HVACA Single Family Residential Repair or Replacement Electrical Project Involving (1 ...
2026-06-0526 113758 BF555 108th Ave NEHVACA Nonresidential Alteration to Existing Structure Low Voltage Only Project Involvi...
2026-06-0526 113756 FI595 106th Ave NEInterior remodelA Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (2 ...
2026-06-0526 113754 BF15305 SE 20th StElectricalA Single Family Residential Repair or Replacement Electrical Project Involving (1 ...
2026-06-0526 113752 BK325 145th Pl SE - Lot 27HVACA Single Family Residential Repair or Replacement None Project Involving (1 Furnac...
2026-06-0526 113759 BF633 110th Ave NEHVACA Nonresidential Alteration to Existing Structure Low Voltage Only Project Involvi...
2026-06-0526 113753 BF929 108th Ave NEElectricalA Nonresidential Alteration to Existing Structure Electrical Project Involving (1 ...
2026-06-0526 113757 BF15045 NE Bellevue-Redmond RdElectricalA Nonresidential Repair or Replacement Electrical Project Involving (Sign Circuit)
2026-06-0526 113789 BK13963 NE 15th CtInterior remodelA Single Family Condo Unit Alteration to Existing Structure None Project Involving...

Access Bellevue permit data via API

Query Bellevue, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Bellevue permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Bellevue&state=WA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Bellevue permit data?

We ingest data directly from the official Bellevue open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Bellevue data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Bellevue, Washington was issued on June 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Bellevue permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Bellevue permits interactively. Sign up for a free API key to get started.

Can I export Bellevue permit data?

Yes. Paid plans support CSV export and periodic webhooks for changed permits.

How long does a Bellevue building permit take to issue?

Most Bellevue permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.

Get Bellevue permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key