Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Washington

Building Permits in Bellevue, Washington

PermitStack indexes 439,600 building permits issued in Bellevue, Washington, with 18,487 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

439,600
Total permits
18,487
Last 12 months
1,530
Last 30 days
-17%
vs same period prior year
Aug 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
4,187
HVAC
2,764
Plumbing
2,340
Interior remodel
1,287
Renovation
620
EV charger
448
Demolition
355
Solar
345
New construction
339
Mechanical
333

Permit data by trade in Bellevue

Drill into the most common permit categories in Bellevue.

Top contractors in Bellevue

Most active contractors by permit volume in Bellevue.

Most recent permits

The 10 most recent permits issued in Bellevue, Washington. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-0526 117924 BF1209 96th Ave SEElectricalA Single Family Residential Alteration to Existing Structure Electrical Project In...
2026-08-0526 117908 BG10445 NE 4th St - Ste MElectricalCommercial tenant improvement for a new Laser Hair Removal facility, 1833242
2026-08-0526 117947 FA929 108th Ave NEElectricalModification to existing fire alarm system for tenant improvements. Installation o...
2026-08-0526 117961 SA700 Bellevue Way NE - Ste 110SignageINSTALL QTY (1) 16FT X 4FT6 INTERNALLY ILLUMINATED DOUBLE FACED PROJECTING BLADE SIGN
2026-08-0526 117919 BF2701 140th Ave NEElectricalA Single Family Residential Alteration to Existing Structure Electrical Project In...
2026-08-0526 117911 LSOtherThis project will provide crack sealing and asphalt patching highways within Area ...
2026-08-0526 117956 FI633 110th Ave NEInterior remodelA Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (10...
2026-08-0526 117950 BZ700 Bellevue Way NE - Unit podiumDemolitionInterior tenant improvement consisting of minor demo, new partitions, case work an...
2026-08-0526 117966 BF11111 NE 8th St - Unit siteHVACA Nonresidential Alteration to Existing Structure Low Voltage Only Project Involvi...
2026-08-0526 117907 BL10445 NE 4th St - Ste MInterior remodelCommercial tenant improvement for a new hair removal facility, 1833242

Access Bellevue permit data via API

Query Bellevue, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Bellevue permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Bellevue&state=WA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Bellevue permit data?

We ingest data directly from the official Bellevue open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Bellevue data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Bellevue, Washington was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Bellevue permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Bellevue permits interactively. Sign up for a free API key to get started.

Can I export Bellevue permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Bellevue building permit take to issue?

Most Bellevue permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.

Get Bellevue permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key