Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Washington

Building Permits in Seattle (Land Use), Washington

Access 24,398 building permits issued in Seattle (Land Use), Washington through a single REST API. Refreshed daily from the official Seattle (Land Use) open data portal and normalized into a consistent schema.

24,398
Total permits
488
Last 12 months
18
Last 30 days
-60%
vs same period prior year
Aug 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Demolition
66
New construction
8
Addition
5
Foundation
5
Fence
4
Grading
3
Interior remodel
1
Electrical
1
Pool
1
Renovation
1

Top contractors in Seattle (Land Use)

Most active contractors by permit volume in Seattle (Land Use).

Most recent permits

The 10 most recent permits issued in Seattle (Land Use), Washington. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-053043686-LU3800 LAKE WASHINGTON BLVD SOtherShoreline Substantial Development Application to allow new sidewalks along a porti...
2026-08-043043353-LU5610 WEST MARGINAL WAY SWOtherLand Use Application to allow maintenance dredging of 17,850 cubic yards in the Lo...
2026-07-313042613-LU2527 NE 92ND STOtherLand Use Application to subdivide one development site into three unit lots. The c...
2026-07-283043131-LU6744 JONES AVE NWOtherLand Use Application to subdivide one development site into four unit lots. The co...
2026-07-283043917-LU6023 44TH AVE SWOtherLand Use Application to subdivide one development site into three unit lots. The c...
2026-07-283043271-LU8316 MARY AVE NWOtherLand Use Application to subdivide one development site into 6 unit lots. The const...
2026-07-273043450-LU1212 E SHELBY STDemolitionShoreline Substantial Development Application to allow a new, 2-story floating hom...
2026-07-273043670-LU2600 FAIRVIEW AVE EAdditionShoreline Substantial Development application to allow an addition to existing flo...
2026-07-203043618-LU7039 24TH AVE NWOtherLand Use Application to adjust the boundary between two parcels of land. Existing ...
2026-07-203043256-LU6318 41ST AVE SWOtherLand Use Application to subdivide one development site into six unit lots. The con...

Access Seattle (Land Use) permit data via API

Query Seattle (Land Use), Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Seattle (Land Use) permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Seattle%20(Land%20Use)&state=WA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Seattle (Land Use) permit data?

We ingest data directly from the official Seattle (Land Use) open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Seattle (Land Use) data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Seattle (Land Use), Washington was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Seattle (Land Use) permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Seattle (Land Use) permits interactively. Sign up for a free API key to get started.

Can I export Seattle (Land Use) permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Seattle (Land Use) building permit take to issue?

The median time from permit filing to issuance in Seattle (Land Use), Washington is 194 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Seattle (Land Use) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key