Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Washington

Building Permits in Redmond, Washington

Access 184,329 building permits issued in Redmond, Washington through a single REST API. Refreshed daily from the official Redmond open data portal and normalized into a consistent schema.

184,329
Total permits
8,676
Last 12 months
767
Last 30 days
-3%
vs same period prior year
Aug 6, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
3,177
HVAC
1,128
Plumbing
1,062
Interior remodel
468
Fire alarm
435
Mechanical
236
New construction
225
Demolition
214
Roofing
147
Solar
135

Permit data by trade in Redmond

Drill into the most common permit categories in Redmond.

Top contractors in Redmond

Most active contractors by permit volume in Redmond.

Most recent permits

The 10 most recent permits issued in Redmond, Washington. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-06ELEC-2026-055012412 W LK SAMMAMISH PKWYHVAC(1) CIRCUIT - 2023 NEC - Furnace & Heat Pump Install Disconnect
2026-08-06ELEC-2026-0547216070 NE 36TH STElectricalVOIDED- plan review needed- (1) FEEDER, (12) CIRCUITS- 2023 NEC- Scope includes re...
2026-08-06PLUM-2026-0546115850 NE 98TH WAYPlumbingUnit E610: (1) ELECTRIC WATER HEATER - 2021 UPC - Remove/Replace 50-gal electric w...
2026-08-06ELEC-2026-055026505 176TH AVE NEElectrical(2) CIRCUIT - 2023 NEC - Remove two Boilers and replace with like in kind boilers ...
2026-08-06PLUM-2026-054768845 166TH AVE NE 202PlumbingUnit B202: (1) GARBAGE DISPOSAL + (1) KITCHEN SINK + (1) OTHER - 2021 UPC - 1. Rel...
2026-08-06ELEC-2026-054758845 166TH AVE NE 202ElectricalUnit B202: (4) CIRCUIT - 2023 NEC - 1: Move 1 receptacle right of range ~12" ...
2026-08-06ELEC-2026-054889461 WILLOWS RD NEElectrical(1) CIRCUIT + (1) OTHER - 2023 NEC - M26160 - Matrix HAC Thermal Chamber - Job 102...
2026-08-06ELEC-2026-0546915571 NE 31ST STElectrical(3) LOW VOLTAGE- 2023 NEC- 531045-Building 41 6K-6767. Install (1) Single Door Car...
2026-08-06PLUM-2026-0546215850 NE 98TH WAY S901HVACUNIT #S901- (1) Electric Wayer Heater- 2021 UPC- remove/replace 50-gal electric wa...
2026-08-06MECH-2026-054996910 OLD REDMOND RD BLDG F 116PlumbingUnit F116 Gunam Rangasamy: (1) GAS PIPING - 2021 IMC - New gas line installed for ...

Access Redmond permit data via API

Query Redmond, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Redmond permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Redmond&state=WA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Redmond permit data?

We ingest data directly from the official Redmond open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Redmond data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Redmond, Washington was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Redmond permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Redmond permits interactively. Sign up for a free API key to get started.

Can I export Redmond permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Redmond building permit take to issue?

Most Redmond permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.

Get Redmond permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key