Access 1,837 building permits issued in Pullman, Washington through a single REST API. Refreshed daily from the official Pullman open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Pullman.
Most active contractors by permit volume in Pullman.
The 10 most recent permits issued in Pullman, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | BLDR26-0774 | 630 SW Winter Cir | Other | Like for Like replacement of 1 Entry Door |
| 2026-08-06 | BLDR26-0772 | 505 SW Center St | Roofing | One layer tear off. Install Duro Last membrane roofing system. |
| 2026-08-06 | BLDR26-0773 | 925 SW Fountain St | Addition | A second story is being added |
| 2026-08-06 | BLDW26-0016 | 1320 NW Hall Dr | Fence | Add in 120 ft long by 4ft retaining wall. |
| 2026-08-06 | BLDM26-0264 | 580 SE Quail Ridge Dr | HVAC | 110,000 btu gas furnace and 4 ton air conditioner change out |
| 2026-08-06 | PWRW26-0269 | 1320 NW Hall Dr | Fence | Using right-of-way to put in retaining wall. |
| 2026-08-06 | BLDR26-0775 | 2335 NW Valley View Dr | Roofing | 34 SQ residential re-roof. Tear off the existing roof system down to deck. Install... |
| 2026-08-06 | BLDM26-0265 | 485 SE Brelsford Dr | Mechanical | New appliances under existing exhaust hood |
| 2026-08-05 | BLDC-26-0222 | 1915 NE Terre View Dr | Roofing | Reroof |
| 2026-08-05 | BLDC-26-0224 | 1915 NE Terre View Dr | Roofing | Reroof |
Query Pullman, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Pullman permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Pullman&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official Pullman open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Pullman, Washington was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Pullman permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Pullman, Washington is 2 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key