Access 322 building permits issued in Orting, Washington through a single REST API. Refreshed daily from the official Orting open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Orting, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | US-WA52005-B-2026-201 | 305 NELSEN ST NE | Roofing | Residential building Re-roof Single-family dwelling |
| 2026-07-31 | US-WA52005-B-2026-168 | 409 FISCHER ST SE | New construction | Residential building New Single-family dwelling |
| 2026-07-31 | US-WA52005-B-2026-189 | 510 CALLENDAR ST NW | Plumbing | Plumbing Replacement Water Heater |
| 2026-07-30 | US-WA52005-B-2026-155 | 303 MEADOW LN SE | New construction | Residential building New Single-family dwelling |
| 2026-07-21 | US-WA52005-B-2026-153 | 303 MEADOW LN SE | Other | Residential building New Single-family dwelling |
| 2026-07-21 | US-WA52005-B-2026-162 | 1201 WILLIAMS CT NW | HVAC | Mechanical New Heat Pump |
| 2026-07-16 | US-WA52005-B-2026-180 | 517 COPE ST SW | HVAC | Mechanical Remodel Heat Pump |
| 2026-07-16 | US-WA52005-B-2026-181 | 111 LEBER ST NE | Plumbing | Plumbing Replacement Sewage System |
| 2026-07-15 | US-WA52005-B-2026-177 | 120 WASHINGTON AVE N | Roofing | Commercial building re-roof other |
| 2026-07-15 | US-WA52005-B-2026-152 | 303 MEADOW LN SE | Other | Residential building New Single-family dwelling |
Query Orting, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Orting permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Orting&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official Orting open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Orting, Washington was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Orting permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Orting, Washington is 14 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key