Access 14,308 building permits issued in Camas, Washington through a single REST API. Refreshed daily from the official Camas open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Camas.
Most active contractors by permit volume in Camas.
The 10 most recent permits issued in Camas, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | FEXS-26-1703 | 5838 94TH | New construction | New Construction |
| 2026-08-06 | BLDR-26-2133 | 2523 NE 3rd Ave | Demolition | Demolition and removal of existing residential dwelling |
| 2026-08-06 | FHOP-26-1078 | 4200 PACIFIC RIM | Addition | TEPI8 PH3 Addition |
| 2026-08-06 | FEXS-26-1704 | 5796 94TH | New construction | New Construction |
| 2026-08-06 | FEXS-26-1708 | 5231 94TH | New construction | New Construction |
| 2026-08-06 | FEXS-26-1707 | 1602 HAZEL | Fire alarm | New 13d system |
| 2026-08-06 | FALS-26-1081 | 4200 PACIFIC RIM | Interior remodel | Analog - Adding a single input module |
| 2026-08-06 | FEXS-26-1710 | 5171 94TH | New construction | New Construction |
| 2026-08-06 | FEXS-26-1706 | 3123 17TH | Fire alarm | New 13d system |
| 2026-08-06 | FEXS-26-1705 | 5139 94TH | New construction | New Construction |
Query Camas, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Camas permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Camas&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official Camas open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Camas, Washington was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Camas permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Camas, Washington is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key