Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Minnesota

Minnetonka, Minnesota Building Permit Search

PermitStack indexes 170,320 building permits on record in Minnetonka, Minnesota, with 10,719 filed or issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

170,320
Total permits
10,719
Last 12 months
688
Last 30 days
-58%
Vs same period prior year
Nov 11, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

Electrical
2,005
Plumbing
1,958
Roofing
1,676
Renovation
1,502
HVAC
1,440
Interior remodel
925
Mechanical
656
Solar
116
Addition
112
EV charger
112

Permit data by trade in Minnetonka

Drill into the most common permit categories in Minnetonka.

Top contractors in Minnetonka

The most active contractors by permit volume in Minnetonka, with a profile of each one's permit history. Counts are permits we hold for Minnetonka.

Permits by ZIP code in Minnetonka

Permit activity for individual ZIP codes in Minnetonka, newest first by volume.

Property history for Minnetonka

Search held permit records for a Minnetonka address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Minnetonka, Minnesota, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-11-11MI3106212400 Cedarwood RidgeHVACMINISPLIT REPLACEMENT
2026-11-11MI31062216458 Ringer RdMechanicalGas Fireplace
2026-11-11MI3106192950 Atwood DrElectricalFull house remodel with basement final build out, with a panel change out = 2 insp...
2026-11-11MI31061713250 Arthur St WRenovation14 doors and windows being replaced into existing openings in stucco facade
2026-11-11MI31062316416 Temple Dr NHVACAC and Furnace
2026-11-11MI31062416416 Temple Dr NHVACAC and Furnace
2026-11-10MI31061414735 Oakways CtEV chargerwire EV charger
2026-11-10MI3105991918 Oakland RdHVACAC and Furnace
2026-11-10MI3106024932 Woodhurst LaPlumbingremodel kitchen and laundry, install tankless water heater
2026-11-10MI3102033412 Oak Ridge Rd 315RenovationReplacing 4 windows and 1 patio door in existing openings

Access Minnetonka permit data via API

Query a page of held Minnetonka, Minnesota permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Minnetonka permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Minnetonka&state=MN&date_after=2026-10-19"

Sources for Minnetonka

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
Permitspermit portal170,3202026-11-11

Other cities we cover

Related coverage in Minnesota and nationwide.

FAQ

Where does PermitStack get Minnetonka permit data?

We ingest Minnetonka's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Minnetonka data?

The newest permit we hold for Minnetonka, Minnesota is dated November 11, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Minnetonka permits without an API key?

You need a free account, which needs no credit card. With it you can search Minnetonka permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Minnetonka permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Minnetonka building permit take to issue?

The median filing-to-issue date gap in the qualifying held Minnetonka records rounds to 0 days. This includes permits issued in the last 12 months with both dates and nonnegative gaps of at most 365 days. Date fields do not establish the submission method or processing speed, and this aggregate is not a forecast for a new application.

Get Minnetonka permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key