PermitStack indexes 248,903 building permits issued in Maple Grove, Minnesota, with 12,932 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types issued in the last year.
Drill into the most common permit categories in Maple Grove.
Most active contractors by permit volume in Maple Grove.
The 10 most recent permits issued in Maple Grove, Minnesota. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-05 | MG424619 | 16608 73rd Ave N | Electrical | To radon system |
| 2026-08-05 | MG424593 | 15800 Grove Cir N | Signage | Replace Enterance Clearance Sign |
| 2026-08-05 | MG424626 | 7250 Kirkwood La N | Plumbing | Replace one (1) gas water heater |
| 2026-08-05 | MG424620 | 7661 Ranier La N | HVAC | FURNACE AND A/C REPL |
| 2026-08-05 | MG421688 | 8683 Peony La N | New construction | New dwelling with finished basement |
| 2026-08-05 | MG424622 | 19077 Gladstone Blvd N | Other | Reside front elevation and front garage return walls only |
| 2026-08-05 | MG424628 | 8474 Upland La N | Other | Replacing 1 existing patio door |
| 2026-08-05 | MG423114 | 18262 104th Cir N | Other | No Sidewalks Porch |
| 2026-08-05 | MG422707 | 16125 Arbor Ridge Parkway | Other | Install (4) ESFR Systems and new fire pump. See plans for details. |
| 2026-08-05 | MG424592 | 15800 Grove Cir N | Signage | Replace Existing Building Material Sign with Lumber |
Query Maple Grove, Minnesota permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Maple Grove permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Maple%20Grove&state=MN&issued_after=2026-04-01"
Related coverage in Minnesota and nationwide.
We ingest data directly from the official Maple Grove open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Maple Grove, Minnesota was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Maple Grove permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Maple Grove permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key