Access 1,627 building permits issued in Le Sueur, Minnesota through a single REST API. Refreshed daily from the official Le Sueur open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Le Sueur, Minnesota. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-04 | LS004088 | 511 4th St N | HVAC | Mini Split Heat Pump Installation |
| 2026-08-04 | LS004086 | 204 Plum Run | New construction | New singel family dwelling. |
| 2026-07-17 | LS004078 | 804 Turril St | New construction | New single family dwelling. |
| 2026-07-17 | LS004079 | 808 Turril St | New construction | New single family dwelling |
| 2026-07-17 | LS004077 | 800 Turril St | New construction | New single family dwelling. |
| 2026-07-15 | LS004080 | 101 4th St N | Other | Installing egress windows in an existing basement. |
| 2026-07-07 | LS004073 | 1200 Commerce St N | Addition | Installing 2 new rooftop AHU's on a commercial building. |
| 2026-06-25 | LS004069 | 291 Forest Prairie Rd | Roofing | Install gas heat electric cool rooftop unit |
| 2026-06-24 | LS004066 | 104 4th St S | Interior remodel | Removing failing CMU front porch and replacing with new wood frame structure. |
| 2026-06-15 | LS004060 | 110 Barony Rd | Roofing | Re-roof |
Query Le Sueur, Minnesota permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Le Sueur permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Le%20Sueur&state=MN&issued_after=2026-04-01"
Related coverage in Minnesota and nationwide.
We ingest data directly from the official Le Sueur open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Le Sueur, Minnesota was issued on August 4, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Le Sueur permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Le Sueur permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key