Access 52,956 building permits issued in Crystal, Minnesota through a single REST API. Refreshed daily from the official Crystal open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Crystal.
Most active contractors by permit volume in Crystal.
The 10 most recent permits issued in Crystal, Minnesota. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-05 | CY093733 | 4420 Adair Ave N | Electrical | 100amp mast replacement |
| 2026-08-05 | CY093736 | 5317 Lakeside Ave N | Electrical | EV charger install |
| 2026-08-04 | CY093725 | 8332 31st Ave N | HVAC | Air Conditioning New/Replace (Residential) |
| 2026-08-04 | CY093726 | 6919 Dudley Ave N | Electrical | Service Panel Change Out |
| 2026-08-04 | CY093732 | 8125 33rd Ave N | Solar | Install solar with battery backup |
| 2026-08-04 | CY093716 | 5412 Georgia Ave N | HVAC | Furnace & A/C New/Replace (Residential) |
| 2026-08-04 | CY093719 | 3124 Edgewood Ave N | Electrical | AIR HANDLER, REPLACE AC |
| 2026-08-04 | CY093731 | 4800 Xenia Ave N | HVAC | Furnace & A/C New/Replace (Residential) |
| 2026-08-04 | CY093720 | 4740 Adair Ave N | HVAC | Rewire Furnace |
| 2026-08-04 | CY093721 | 5707 West Broadway | Electrical | Small bathroom remodel |
Query Crystal, Minnesota permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Crystal permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Crystal&state=MN&issued_after=2026-04-01"
Related coverage in Minnesota and nationwide.
We ingest data directly from the official Crystal open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Crystal, Minnesota was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Crystal permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Crystal permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key