Access 10,753 building permits issued in Bloomington, Minnesota through a single REST API. Refreshed daily from the official Bloomington open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Bloomington, Minnesota. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-07-31 | PRBD202609035 | 9405 OLD CEDAR AVE S | Interior remodel | Remodeling 2nd floor bathroom, and basement laundry room |
| 2026-07-31 | PRBD202609211 | 10001 CHICAGO AVE S | Roofing | Reroof tear out sky light and replace with new sky light. |
| 2026-07-31 | PRBD202608176 | 8910 11TH AVE S | Other | New egress window and window well, 4 new basement windows, 2 new entry doors |
| 2026-07-31 | PRBD202609045 | 10000 CHOWEN AVE S | Other | 1 fix skylight replacement like for like. |
| 2026-07-31 | PRBD202609272 | 8640 ELLIOT AVE S | Renovation | Remove and replace 1 window like for like |
| 2026-07-31 | PRBD202609342 | 9907 LITTLE RD | Other | Replacing 1 entry door, same size |
| 2026-07-31 | PRBD202608931 | 5200 W 98TH ST | Interior remodel | REPLACE (46) 1ST FLOOR WINDOWS WITH SAME SIZE AND STYLE. NO ALTERATION TO ROUGH O... |
| 2026-07-30 | PRBD202606292 | 7940 12TH AVE S | Other | New tenant in the unit; no major alterations will be made. |
| 2026-07-30 | PRBD202609192 | 9657 XYLON AVE S | Renovation | Rot repair and reframing. |
| 2026-07-30 | PRBD202606398 | 8011 34TH AVE S | Other | Building office walls and installing two doors. New tenant - |
Query Bloomington, Minnesota permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Bloomington permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Bloomington&state=MN&issued_after=2026-04-01"
Related coverage in Minnesota and nationwide.
We ingest data directly from the official Bloomington open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Bloomington, Minnesota was issued on July 31, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Bloomington permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key