Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Massachusetts

Building Permits in Somerville (Applications), Massachusetts

Access 102,650 building permits issued in Somerville (Applications), Massachusetts through a single REST API. Refreshed daily from the official Somerville (Applications) open data portal and normalized into a consistent schema.

102,650
Total permits
7,832
Last 12 months
518
Last 30 days
-29%
vs same period prior year
Aug 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Interior remodel
871
HVAC
631
Electrical
586
Roofing
383
Plumbing
373
Renovation
346
Solar
252
Foundation
187
Demolition
181
Mechanical
170

Permit data by trade in Somerville (Applications)

Drill into the most common permit categories in Somerville (Applications).

Most recent permits

The 10 most recent permits issued in Somerville (Applications), Massachusetts. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-05B26-00095914 CARLTON ST, SOMERVILLE MASSACHUSETTS 02143RoofingRemove and rebuild existing roof deck in the same size and layout. Install new pre...
2026-08-05DP26-00011214 BUCKINGHAM ST, SOMERVILLE MASSACHUSETTS 02143Interior remodelDumpster on Street For Dining Room Remodel
2026-08-05HTF26-000169191 HIGHLAND AVE, SOMERVILLE MASSACHUSETTSOtherRound Table Farm
2026-08-05P26-00044222 FENWICK ST, SOMERVILLE MASSACHUSETTS 02145MechanicalReplace heating boiler
2026-08-05B26-00093517 CARLTON ST, SOMERVILLE MASSACHUSETTS 02143RoofingComplete renovation reconstruction of existing residential building. Scope include...
2026-08-05B26-0009017 ASHLAND ST, SOMERVILLE MASSACHUSETTS 02144OtherI.E Install 38 double hung windows
2026-08-05B26-000406318 SUMMER ST, SOMERVILLE MASSACHUSETTS 02144OtherRebuilding back yard decks for 2 units
2026-08-05B26-0011681 FRANEY RD, SOMERVILLE MASSACHUSETTSRoofingRemove existing roof system and replace with new insulation and membrane roof system
2026-08-05B26-00030646 MOUNT VERNON ST, SOMERVILLE MASSACHUSETTS 02145FoundationFoundation only for backyard cottage
2026-08-05P26-00045023 ELM ST, SOMERVILLE MASSACHUSETTS 02143PlumbingReplace the existing water heater

Access Somerville (Applications) permit data via API

Query Somerville (Applications), Massachusetts permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Somerville (Applications) permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Somerville%20(Applications)&state=MA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Massachusetts and nationwide.

FAQ

Where does PermitStack get Somerville (Applications) permit data?

We ingest data directly from the official Somerville (Applications) open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Somerville (Applications) data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Somerville (Applications), Massachusetts was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Somerville (Applications) permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Somerville (Applications) permits interactively. Sign up for a free API key to get started.

Can I export Somerville (Applications) permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Somerville (Applications) building permit take to issue?

The median time from permit filing to issuance in Somerville (Applications), Massachusetts is 17 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Somerville (Applications) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key