Access 75,863 building permits issued in Malden, Massachusetts through a single REST API. Refreshed daily from the official Malden open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Malden.
Most active contractors by permit volume in Malden.
The 10 most recent permits issued in Malden, Massachusetts. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | ELEC-078168-2026 | 148 HAWTHORNE ST | Solar | INSTALL 13 460W SOLAR PANELS ON ROOFTOP OF HOME 5.980KW DC |
| 2026-08-06 | RES-078173-2026 | 40 BOULDER ST | Other | Landscaping permit for patio and retention wall |
| 2026-08-06 | RES-078171-2026 | 250 CLIFTON ST | Roofing | strip re-roof |
| 2026-08-06 | ELEC-078175-2026 | 51 RIVERS LN | Electrical | Relocated 2 pendant lights, add two receptacles in the island |
| 2026-08-06 | RES-078174-2026 | 30 HARVARD ST | Demolition | Sara Painting will be responsible for obtaining the required building permit |
| 2026-08-06 | RES-078167-2026 | 148 HAWTHORNE ST | Solar | INSTALL 13 460W SOLAR PANELS ON ROOFTOP OF RESIDENCE 5.980KW DC |
| 2026-08-06 | RES-078160-2026 | 13 PRESTON ST | Other | FOAMBOARD AND FIBERGLASS IN THE KNEEWALLS, DENSEPACK IN THE WALLS AND GARAGE CEIL... |
| 2026-08-06 | RES-078170-2026 | 99 PAMELA CIR | Renovation | Repair and replace what's needed to front steps. |
| 2026-08-06 | SMOKE-2026-03140 | 78 UPHAM ST | Other | Selling my home 76-78 Upham St and need the certificate to be able to sell. |
| 2026-08-05 | SHMT-078146-2026 | 10 LINWOOD ST | HVAC | replace condenser and air handler |
Query Malden, Massachusetts permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Malden permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Malden&state=MA&issued_after=2026-04-01"
Related coverage in Massachusetts and nationwide.
We ingest data directly from the official Malden open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Malden, Massachusetts was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Malden permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Malden, Massachusetts is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key