Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Massachusetts

Building Permits in Cambridge (Roofing), Massachusetts

Access 2,541 building permits issued in Cambridge (Roofing), Massachusetts through a single REST API. Refreshed daily from the official Cambridge (Roofing) open data portal and normalized into a consistent schema.

2,541
Total permits
282
Last 12 months
21
Last 30 days
vs same period prior year
Aug 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Roofing
280
HVAC
1
Solar
1

Permit data by trade in Cambridge (Roofing)

Drill into the most common permit categories in Cambridge (Roofing).

Top contractors in Cambridge (Roofing)

Most active contractors by permit volume in Cambridge (Roofing).

Most recent permits

The 10 most recent permits issued in Cambridge (Roofing), Massachusetts. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-0512242708 Tremont St, Cambridge, MA 02139Roofing1. The existing roof system will remain in place.2. The existing drip edges will r...
2026-08-031223799166 Charles St, Cambridge, MA 02141RoofingAsphalt shingles replacement on the 3/12 section on back section of house attached...
2026-08-03122410018-20 CLAY ST, Unit 3, Cambridge, MA 02140RoofingREMOVE EXISTING MEMBRANE RUBBER AND INSULATION.RE- INSTALL NEW 1" ISO BOARD I...
2026-08-03122384336-48 BROOKFORD ST, Unit 3, Cambridge, MA 02140RoofingRemove existing EPDM roofing and install approximately 62 squares of new 60-mil EP...
2026-08-03122380569 Walker St, Cambridge, MA 02138RoofingGutter Cleaning, Tightening, and Caulking of all gutters on 69 & 69A Walker St...
2026-07-291223384873 Cambridge St, Cambridge, MA 02141RoofingReplace rubber membrane with insulation board roofing
2026-07-2812214576 Channing Pl, Cambridge, MA 02138RoofingNew rubber roof strip install removal shingles roll roofing
2026-07-271222481279 Cardinal Medeiros Ave, Unit 3, Cambridge, MA 0RoofingTear off membrane roof install new TPO roofing system
2026-07-27122245847-49 PEMBERTON ST, Unit 3, Cambridge, MA 02140RoofingReplace roofing insulation install white EPDM membrane
2026-07-241220499442 Broadway, Cambridge, MA 02138RoofingReplace fascia board, gutter, and downspouts

Access Cambridge (Roofing) permit data via API

Query Cambridge (Roofing), Massachusetts permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Cambridge (Roofing) permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Cambridge%20(Roofing)&state=MA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Massachusetts and nationwide.

FAQ

Where does PermitStack get Cambridge (Roofing) permit data?

We ingest data directly from the official Cambridge (Roofing) open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Cambridge (Roofing) data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Cambridge (Roofing), Massachusetts was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Cambridge (Roofing) permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Cambridge (Roofing) permits interactively. Sign up for a free API key to get started.

Can I export Cambridge (Roofing) permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Cambridge (Roofing) building permit take to issue?

The median time from permit filing to issuance in Cambridge (Roofing), Massachusetts is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Cambridge (Roofing) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key