Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Massachusetts

Building Permits in Cambridge (Electrical), Massachusetts

Access 21,320 building permits issued in Cambridge (Electrical), Massachusetts through a single REST API. Refreshed daily from the official Cambridge (Electrical) open data portal and normalized into a consistent schema.

21,320
Total permits
2,451
Last 12 months
205
Last 30 days
-2%
vs same period prior year
Aug 5, 2026
Latest permit

Most recent permits

The 10 most recent permits issued in Cambridge (Electrical), Massachusetts. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-07-14121990536 Jfk St, Cambridge, MA 02138ElectricalSELF INSURED
2026-05-2212118501 Field St, Cambridge, MA 02138ElectricalSafety Insurance Gen Liability: BMA0026842
2026-05-041204572212 Norfolk St, Unit 2, Cambridge, MA 02139Electricalowner exemption
2026-01-22119585717 YORK PL, Unit 1, Cambridge, MA 02141ElectricalLiability
2025-11-12118847448 Berkshire St, Unit 1, Cambridge, MA 02141ElectricalWaiver
2025-10-01118491830 Winter St, Cambridge, MA 02141ElectricalWorker's Compensation
2025-08-111176269159 Appleton St, Cambridge, MA 02138ElectricalWorkers Compensation
2025-07-0711721409 Hollis St, Cambridge, MA 02140Electricalworkers compensation
2025-06-17117020661 Harvey St, Cambridge, MA 02140ElectricalLiability
2025-05-281165457281 Pearl St, Cambridge, MA 02139ElectricalWaived by HO

Access Cambridge (Electrical) permit data via API

Query Cambridge (Electrical), Massachusetts permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Cambridge (Electrical) permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Cambridge%20(Electrical)&state=MA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Massachusetts and nationwide.

FAQ

Where does PermitStack get Cambridge (Electrical) permit data?

We ingest data directly from the official Cambridge (Electrical) open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Cambridge (Electrical) data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Cambridge (Electrical), Massachusetts was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Cambridge (Electrical) permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Cambridge (Electrical) permits interactively. Sign up for a free API key to get started.

Can I export Cambridge (Electrical) permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Cambridge (Electrical) building permit take to issue?

The median time from permit filing to issuance in Cambridge (Electrical), Massachusetts is 7 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Cambridge (Electrical) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key