Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Massachusetts

Building Permits in Cambridge (Additions), Massachusetts

Access 14,218 building permits issued in Cambridge (Additions), Massachusetts through a single REST API. Refreshed daily from the official Cambridge (Additions) open data portal and normalized into a consistent schema.

14,218
Total permits
1,608
Last 12 months
87
Last 30 days
-47%
vs same period prior year
Aug 4, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Addition
1,185
Demolition
114
Roofing
101
Electrical
82
HVAC
77
Plumbing
37
New construction
10
Solar
2

Permit data by trade in Cambridge (Additions)

Drill into the most common permit categories in Cambridge (Additions).

Top contractors in Cambridge (Additions)

Most active contractors by permit volume in Cambridge (Additions).

Most recent permits

The 10 most recent permits issued in Cambridge (Additions), Massachusetts. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-04121915015 Harrington Rd, Cambridge, MA 02140RoofingStrip and re-roof.Quantity-(8 sq)Install new replacement windows and new door.Disp...
2026-08-0412225541775 Massachusetts Ave, Cambridge, MA 02140Addition1775 Mass Avenue - Units 1, 3, 5, 7(Bathrooms & Kitchen)Open walls, ceilings a...
2026-08-041220821310 Harvard St, Cambridge, MA 02139AdditionREMOVE AND REPLACE 15 WINDOWS; LIKE FOR LIKE SIZE; NO STRUCTURAL CHANGES
2026-08-04122416131 Fairmont St, Cambridge, MA 02139HVACRenovate kitchen and 2 bathrooms in place, installing 3 replacement windows and 1 ...
2026-08-04120400674 CUSHING ST, Unit 1, Cambridge, MA 02138DemolitionConverting single family home to a 2-family home.  Unit 1 includes basement and 1s...
2026-07-31121268418 Donnell St, Cambridge, MA 02138ElectricalINTERIOR WORKDemolition & Removal:Removal and disposal of existing kitchen cab...
2026-07-301221737577 Franklin St, Cambridge, MA 02139AdditionEnlarge front basement window, dig out one half of basement ( approx 12' x 20&...
2026-07-30121861375-83 CAMBRIDGE PKWY, Unit E807, Cambridge, MA 021ElectricalDemo of the kitchen down to sheetrock. installation of new flooring, cabinets, plu...
2026-07-301222130983 Memorial Dr, Cambridge, MA 02138Plumbingopen wet walls to accomadate replacement of plumbing stacj and rebuld after plumbi...
2026-07-30121824231 Richard Ave, Cambridge, MA 02140AdditionInstalling Ortal Heat Gas Fireplace.

Access Cambridge (Additions) permit data via API

Query Cambridge (Additions), Massachusetts permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all Cambridge (Additions) permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Cambridge%20(Additions)&state=MA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Massachusetts and nationwide.

FAQ

Where does PermitStack get Cambridge (Additions) permit data?

We ingest data directly from the official Cambridge (Additions) open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the Cambridge (Additions) data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Cambridge (Additions), Massachusetts was issued on August 4, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access Cambridge (Additions) permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter Cambridge (Additions) permits interactively. Sign up for a free API key to get started.

Can I export Cambridge (Additions) permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a Cambridge (Additions) building permit take to issue?

The median time from permit filing to issuance in Cambridge (Additions), Massachusetts is 17 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Cambridge (Additions) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key