Access 11,799 building permits issued in Superior, Wisconsin through a single REST API. Refreshed daily from the official Superior open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Superior.
Most active contractors by permit volume in Superior.
The 10 most recent permits issued in Superior, Wisconsin. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | RESD-8542-0826 | 1017 LINCOLN | Roofing | tear off and re-shingle the house and garage roofs. |
| 2026-08-06 | COMM-2399-0826 | 600 21ST | Interior remodel | Fire sprinkler system remodel per new wall and ceiling work |
| 2026-08-06 | RESD-8547-0826 | 1011 BROADWAY | HVAC | Replacement - Trane 1.5 Ton Condensing Unit |
| 2026-08-06 | COMM-2398-0826 | 525 HAMMOND | Plumbing | Cap Sewer Line |
| 2026-08-06 | RESD-8556-0826 | 1812 JOHN | Electrical | Lead service line replacement (Midtown - Phase 1): |
| 2026-08-06 | COMM-2395-0826 | 1902 JOHN | Electrical | Lead service line replacement (Midtown - Phase 1): |
| 2026-08-06 | RESD-8540-0826 | 913 22ND | Plumbing | -Replace water lines after the meter |
| 2026-08-06 | COMM-2393-0826 | 1409 HAMMOND | HVAC | Expanding conference room in suite 344. |
| 2026-08-06 | COMM-2400-0826 | — | Solar | Adding Rooftop solar to the operations and cold storage buildings as shown on the ... |
| 2026-08-06 | COMM-2397-0826 | 1820 JOHN | Electrical | Lead service line replacement (Midtown - Phase 1): |
Query Superior, Wisconsin permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Superior permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Superior&state=WI&issued_after=2026-04-01"
Related coverage in Wisconsin and nationwide.
We ingest data directly from the official Superior open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Superior, Wisconsin was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Superior permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Superior, Wisconsin is 3 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key