PermitStack indexes 117,762 building permits issued in Mesquite, Texas, with 14,669 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types issued in the last year.
Drill into the most common permit categories in Mesquite.
Most active contractors by permit volume in Mesquite.
The 10 most recent permits issued in Mesquite, Texas. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-07 | ER0826-11389 | 1617 ALLEN | Electrical | wire new construction per code |
| 2026-08-06 | PR0826-23631 | 2625 DANIEL CREEK | Plumbing | Water main spot repair 18" deep (hand dug) front yard |
| 2026-08-06 | BR0826-34361 | 1617 BLACKBIRD | New construction | New Construction of a Single-Family Residential Building |
| 2026-08-06 | PR0826-23632 | 3717 SUSAN | Plumbing | Replace water service |
| 2026-08-06 | ROW0826-17109 | 1821 SUMMER AURA | Other | bury AT&T service line |
| 2026-08-06 | ROW0826-17104 | 3401 TOWN PARK | Other | bury AT&T service line |
| 2026-08-06 | EC0826-4745 | 427 TOWN EAST | Electrical | Reconnect electrical |
| 2026-08-06 | EC0826-4746 | 3349 IH 30 | Electrical | Oncor disconnected the power, because the owner changed the name on the account to... |
| 2026-08-06 | BR0826-34362 | 1216 PINE COUNTRY | New construction | New Construction of a Single-Family Residential Building |
| 2026-08-06 | ROW0826-17118 | 730 BARNES BRIDGE | Renovation | WO 33195478 |
Query Mesquite, Texas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Mesquite permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Mesquite&state=TX&issued_after=2026-04-01"
Related coverage in Texas and nationwide.
We ingest data directly from the official Mesquite open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Mesquite, Texas was issued on August 7, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Mesquite permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Mesquite, Texas is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key