Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Texas

Building Permits in College Station, Texas

Access 179,797 building permits issued in College Station, Texas through a single REST API. Refreshed daily from the official College Station open data portal and normalized into a consistent schema.

179,797
Total permits
7,316
Last 12 months
496
Last 30 days
-23%
vs same period prior year
Jul 30, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Plumbing
1,376
Mechanical
1,296
Electrical
1,113
Roofing
465
Signage
130
Interior remodel
120
Pool
82
Foundation
64
Demolition
59
HVAC
55

Permit data by trade in College Station

Drill into the most common permit categories in College Station.

Most recent permits

The 10 most recent permits issued in College Station, Texas. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-07-30SIGN2026-0000624910 Lakeway DrSignageFera Diagnostics & Biologicals
2026-07-30SIGN2026-0000872160 Rock Prairie RdSignageCircle K #2741906 Rebrand
2026-07-30NOE2026-0000952326 Harvey Mitchell Pkwy SOtherAssisted Living and Memory Care
2026-07-30WALK2026-000051910 William D Fitch Pkwy 100OtherG's Southside ITalian Cafe
2026-07-30NOE2026-00009414565 Fm 2154 100OtherBrazos Moving and Storage No 6
2026-07-30MCHG2026-0004502501 Sumter DrHVACResidential Hvac Equipment Change Out-3.5t Gas System
2026-07-29ELEC2026-0007092216 Texas Ave SElectricalHappy Hour Pilates
2026-07-29PLGS2026-0004773411 Longmire DrPlumbingThe Brazos Valley Masonic Library
2026-07-29SIGN2026-0000801651 Crescent Pointe PkwySignageMiddleton & Middleton
2026-07-29ELEC2026-0007043411 Longmire DrElectricalBrazos Valley Masonic Library & Museum

Access College Station permit data via API

Query College Station, Texas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all College Station permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=College%20Station&state=TX&issued_after=2026-04-01"

Other cities we cover

Related coverage in Texas and nationwide.

FAQ

Where does PermitStack get College Station permit data?

We ingest data directly from the official College Station open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the College Station data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for College Station, Texas was issued on July 30, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access College Station permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter College Station permits interactively. Sign up for a free API key to get started.

Can I export College Station permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a College Station building permit take to issue?

The median time from permit filing to issuance in College Station, Texas is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get College Station permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key