Access 5,200 building permits issued in La Vergne Permitting, Tennessee through a single REST API. Refreshed daily from the official La Vergne Permitting open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in La Vergne Permitting.
Most active contractors by permit volume in La Vergne Permitting.
The 10 most recent permits issued in La Vergne Permitting, Tennessee. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | MECR-0857-2026 | 453 Sandhill SHH07 | HVAC | New construction HVAC: Lot 7 |
| 2026-08-06 | BLDR-0863-2026 | 210 Wild Daisy AR568 | New construction | Single Family Residential: Lot 568 |
| 2026-08-06 | BLDR-0858-2026 | 132 BLUE VALLEY | Addition | adding 2 story addition |
| 2026-08-06 | BLDR-0862-2026 | 141 Cowslip AR508 | New construction | Single Family Residential: Lot 508 |
| 2026-08-06 | BLDR-0865-2026 | 212 Wild Daisy AR567 | New construction | Single Family Residential: Lot 567 |
| 2026-08-06 | BLDR-0866-2026 | 143 Cowslip AR507 | New construction | Single Family Residential: Lot 507 |
| 2026-08-06 | PLMC-0864-2026 | 463 DICK BUCHANAN | Plumbing | Plumbing for addition onto building |
| 2026-08-06 | BLDR-0867-2026 | 145 Cowslip AR506 | New construction | Single Family Residential: Lot 506 |
| 2026-08-06 | BLDR-0868-2026 | 1106 GROVE MILL | Other | Adding shed to backyard |
| 2026-08-06 | MECR-0855-2026 | 218 Vanguard MH260 | HVAC | Residential HVAC New Construction: Lot 260 |
Query La Vergne Permitting, Tennessee permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all La Vergne Permitting permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=La%20Vergne%20Permitting&state=TN&issued_after=2026-04-01"
Related coverage in Tennessee and nationwide.
We ingest data directly from the official La Vergne Permitting open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for La Vergne Permitting, Tennessee was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter La Vergne Permitting permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in La Vergne Permitting, Tennessee is 2 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key