Access 12,867 building permits issued in Dover (NH), New Hampshire through a single REST API. Refreshed daily from the official Dover (NH) open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Dover (NH).
Most active contractors by permit volume in Dover (NH).
The 10 most recent permits issued in Dover (NH), New Hampshire. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | BLDM-2026-0437 | 13 RIVERSIDE DR | New construction | Freestanding garage 23’ wide x 27’ long |
| 2026-08-06 | MECH-2026-0495 | 19 ISAAC LUCAS CR | Plumbing | Natural gas boiler replacement with indirect water heater. Like for like swap |
| 2026-08-06 | BLDG-2026-0102 | 9 LIAM DR | New construction | New Single Family Residence [Foundation already permitted seperately] |
| 2026-08-06 | BLDG-2026-0103 | 11 LIAM DR | New construction | New single family residence [Foundation already permitted seperately] |
| 2026-08-06 | BLDG-2026-0106 | 143 LONG HILL RD | Plumbing | 28'X60' single family |
| 2026-08-06 | PLMB-2026-0396 | 2 CENTER DR | Plumbing | New ADU dwelling with kitchen sink, dishwasher & full bathroom. Electric Water... |
| 2026-08-06 | MECH-2026-0496 | 9 PROSPERITY DR | Mechanical | INSTALLATION OF 1-500UGT WITH UG LINE TO HOUSE WITH CONNECTION TO STUB INSTALLED B... |
| 2026-08-06 | BLDG-2026-0105 | 17 LIAM DR | New construction | New single family residence [Foundation permitted previously] |
| 2026-08-06 | BLDG-2026-0104 | 15 LIAM DR | New construction | New single family residence [Foundation permitted previously] |
| 2026-08-06 | ELEC-2026-0420 | 26 PICNIC ROCK DR | Electrical | Install countertop outlets to current code requirements throughout kitchen counter... |
Query Dover (NH), New Hampshire permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Dover (NH) permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Dover%20(NH)&state=NH&issued_after=2026-04-01"
Related coverage in New Hampshire and nationwide.
We ingest data directly from the official Dover (NH) open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Dover (NH), New Hampshire was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Dover (NH) permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Dover (NH), New Hampshire is 6 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key