Access 17,024 building permits issued in Hattiesburg, Mississippi through a single REST API. Refreshed daily from the official Hattiesburg open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Hattiesburg, Mississippi. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-04 | GAS-06-26-025050 | 301 19TH | Other | GAS HAS BEEN OFF A WHILE |
| 2026-06-04 | ELEC-06-26-025040 | 219 PINEHILLS | Electrical | TREE LIMB FELL AND BROKEN THE WEATHER HEAD ROD PIPE OFF THE HOUSE POWER PANEL |
| 2026-06-03 | GAS-06-26-025039 | 99 ROSA | Other | GAS HAS BEEN OFF OVER TIME LIMITS MORE THAN 3 MONTHS |
| 2026-06-03 | HRSD-06-26-025035 | 2013 MAMIE | Roofing | REMOVE CURRENT SHINGLE SYSTEM DOWN TO THE DECKING, INSTALL NEW GAF SHINGLE SYSTEM |
| 2026-06-02 | ELEC-06-26-025029 | 415 14TH | Electrical | 200 AMP METER CAN/DISCONNECT CHANGE / EXISTING SERVICE |
| 2026-06-01 | ELEC-06-26-025019 | 5004 LINCOLN | Electrical | POWER FOR OVER 6 MONTHS NEED TO BE TURN ON |
| 2026-05-29 | GAS-05-26-025015 | 113 HILLENDALE | Renovation | REPAIR GAS LEAK TO RECONNECT THE GAS THIS IS OCCUPIED |
| 2026-05-27 | RESD-05-26-025004 | 100 TIPTON | Roofing | ROOF TO HAVE EVERYTHING DOWN TO THE ORIGINAL TNG, TARE OFF THE DECKING PLACED DOWN... |
| 2026-05-27 | RESD-05-26-025009 | 2008 EDDY | Roofing | Repair roof ridge approximately 2 feet |
| 2026-05-27 | RESD-05-26-025008 | 3100 PRINCE GEORGE | Roofing | ROOFING-REPAIR |
Query Hattiesburg, Mississippi permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Hattiesburg permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Hattiesburg&state=MS&issued_after=2026-04-01"
Related coverage in Mississippi and nationwide.
We ingest data directly from the official Hattiesburg open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Hattiesburg, Mississippi was issued on June 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Hattiesburg permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Hattiesburg, Mississippi is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key