Access 27,830 building permits issued in Hattiesburg, Mississippi through a single REST API. Refreshed daily from the official Hattiesburg open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Hattiesburg.
Most active contractors by permit volume in Hattiesburg.
The 10 most recent permits issued in Hattiesburg, Mississippi. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | ELEC-08-26-025411 | 3207 ARLINGTON | Electrical | OLD METER HAD NO BREAKER SPACES AND THE MAST WAS BENT |
| 2026-08-06 | RESD-08-26-025416 | 411 DIXIE | Roofing | REMOVE EXISTING ROOFING AND PROPERPLY DISPOSE. FURNISH AND INSTALL ICE AND WATER ... |
| 2026-08-06 | HRSD-08-26-025414 | 404 6TH | EV charger | INSTALL NEW ELECTRICAL SERVICE TO DETACHED GARAGE BUILDING. INSTALL BRAND CIRCUIT... |
| 2026-08-06 | GAS-08-26-025413 | 716 MONTROSE | Other | GAS PRESSURE TEST |
| 2026-08-06 | HRSD-08-26-025412 | 403 SOUTHERN | Renovation | INSTALL GUARDERS UNDER JOISTS MID SPAN OF HOUSE OR I BEANS |
| 2026-08-06 | CBLD-08-26-025410 | 3102 HARDY | Demolition | INTERIOR DEMO ONLY |
| 2026-08-06 | RESD-08-26-025415 | 89 GOLF COURSE | Foundation | FOUNDATION REPAIR |
| 2026-08-06 | HRSD-08-26-025417 | 127 5TH | Electrical | REPLACE STOLEN WIRE IN HOUSE AND RESTORE POWER , THIS IS FOR ELECTRICAL ONLY, WE W... |
| 2026-08-05 | RESD-08-26-025406 | 2916 JAMESTOWN | Roofing | ROOF REPLACE |
| 2026-08-05 | CBLD-08-26-025392 | 32 RASPBERRY | HVAC | REMOVE 10 HVAC UNITS ON ROOF AND INSTALL CURB CAPS, REMOVE EXISTING PERIMETER AND ... |
Query Hattiesburg, Mississippi permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Hattiesburg permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Hattiesburg&state=MS&issued_after=2026-04-01"
Related coverage in Mississippi and nationwide.
We ingest data directly from the official Hattiesburg open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Hattiesburg, Mississippi was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Hattiesburg permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Hattiesburg, Mississippi is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key