Products API & Data Search Coverage Property History Alerts Contractor Leads Data Exports
Solutions Solar & Energy Solar Permit Data Roofing HVAC Real Estate Insurance Contractors
Pricing API Docs Sign In Get Started
Louisiana

Building Permits in New Orleans (Active), Louisiana

PermitStack indexes 454,327 building permits issued in New Orleans (Active), Louisiana, with 28,894 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

454,327
Total permits
28,894
Last 12 months
1,994
Last 30 days
-31%
vs same period prior year
Aug 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Electrical
4,392
HVAC
3,433
Plumbing
2,832
Roofing
2,560
Renovation
1,423
Interior remodel
1,235
New construction
993
Demolition
521
Solar
517
Signage
418

Permit data by trade in New Orleans (Active)

Drill into the most common permit categories in New Orleans (Active).

Top contractors in New Orleans (Active)

Most active contractors by permit volume in New Orleans (Active).

Most recent permits

The 10 most recent permits issued in New Orleans (Active), Louisiana. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-0526-22503-SERV2634 Chartres StElectricalElectrical work in support of the renovation of an existing two-story residential ...
2026-08-0526-03689-PLMB1338 Kerlerec StInterior remodelReset eight fixtures: Two (2) water closets, three (3) lavatories, one (1) kitchen...
2026-08-0526-10653-VCGEN209 Decatur StHVACTo replace roof per attached materials stamped VCC approved 08/05/2026, as follows:
2026-08-0526-22872-PLMB810 N Rampart StOther1 toilet - 1 Lavatory
2026-08-0524-06851-RNVN2031-2033 Dumaine StHVACRemove all site debris and haul to legal dump facility. Jack & level existing ...
2026-08-0525-12239-RNVS3201-3205 Orleans AveAdditionThe second floor addition of 936 s.f. as a residential dwelling as a camel-back st...
2026-08-0524-38089-RNVN716 Dumaine StSolarRemove asbestos bagging it as its removed from main house and back house. Install...
2026-08-0525-31111-RNVN3618 Timber Bluff LnRenovationremove damaged sheetrock in various. Install sheetrock, insulation(tape, hang , fl...
2026-08-0526-20246-SERV616 Ursulines AveElectricalhe Sub-Contrac or agr es to furnis all material and
2026-08-0526-02106-RNVN1618-1620 Touro StElectricalpainting of interior and exterior, electrical panel upgrade, vacancy inspection fo...

Access New Orleans (Active) permit data via API

Query New Orleans (Active), Louisiana permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search all New Orleans (Active) permits issued this month
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=New%20Orleans%20(Active)&state=LA&issued_after=2026-04-01"

Other cities we cover

Related coverage in Louisiana and nationwide.

FAQ

Where does PermitStack get New Orleans (Active) permit data?

We ingest data directly from the official New Orleans (Active) open data portal (Tyler Data & Insights (Socrata)) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.

How current is the New Orleans (Active) data?

Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for New Orleans (Active), Louisiana was issued on August 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.

Can I access New Orleans (Active) permits without an API key?

Yes — our free tier includes 100 requests per day, enough to search and filter New Orleans (Active) permits interactively. Sign up for a free API key to get started.

Can I export New Orleans (Active) permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.

How long does a New Orleans (Active) building permit take to issue?

The median time from permit filing to issuance in New Orleans (Active), Louisiana is 8 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get New Orleans (Active) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key