Access 816 building permits issued in Dallas, Georgia through a single REST API. Refreshed daily from the official Dallas open data portal and normalized into a consistent schema.
Most active contractors by permit volume in Dallas.
The 10 most recent permits issued in Dallas, Georgia. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| No recent permits. | ||||
Query Dallas, Georgia permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Dallas permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Dallas&state=GA&issued_after=2026-04-01"
Related coverage in Georgia and nationwide.
We ingest data directly from the official Dallas open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Dallas, Georgia was issued on August 4, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Dallas permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Dallas, Georgia is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key