Access 23,103 building permits issued in Miramar, Florida through a single REST API. Refreshed daily from the official Miramar open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Miramar.
The 10 most recent permits issued in Miramar, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | BLDR-010327-2026 | 3740 147TH | Roofing | Remove old roof system and install new 24g Standing Seam Metal |
| 2026-08-06 | MECC-010318-2026 | 6151 MIRAMAR | Plumbing | Replace cooling tower with two new pumps. Install electric for new cooling tower. ... |
| 2026-08-06 | RE-010343-2026 | 12833 50 | Fence | RENEWAL OF BLD05-02204-S010-BLD05-02204 |
| 2026-08-06 | ELER-010330-2026 | 17065 33RD | Electrical | Create 240-v 60-amp circuit and install Tesla Charger starting at garage service p... |
| 2026-08-06 | ELEC-000619-0826 | 2937 160TH | Electrical | CONDUCT REPAIRS AS PER ZCU-2026-0336 |
| 2026-08-06 | BLDR-010322-2026 | 9820 FERN | Roofing | REROOF SHINGLE |
| 2026-08-06 | ZCU-2026-0411 | 2700 UNIVERSITY | Other | After School Tutoring |
| 2026-08-06 | BLDC-010346-2026 | — | Foundation | FOUNDATION WORK FOR SMALL WIRELESS POLE IN BROWARD ROW, BROWARD ROW PERMIT 2604156... |
| 2026-08-06 | BLDR-010340-2026 | 12833 50 | Fence | CHANGE OF CONTRACTOR FOR BLD05-02204-S010-BLD05-02204 |
| 2026-08-06 | ENGCON-000044-2026 | — | Other | Miramar Cove - Offsite Improvements |
Query Miramar, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Miramar permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Miramar&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Miramar open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Miramar, Florida was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Miramar permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Miramar, Florida is 42 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key