PermitStack indexes 338,613 building permits issued in Lake County, Florida, with 14,327 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types issued in the last year.
Drill into the most common permit categories in Lake County.
Most active contractors by permit volume in Lake County.
The 10 most recent permits issued in Lake County, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-04 | 2026060209 | 10868 LAKE MINNEOLA SHORES | Other | BLOCKWALL AND GATES AT FRONT ENTRANCE |
| 2026-08-04 | 2026070288 | 16930 SUGAR BERRY LN | HVAC | SAME FOR SAME HVAC CHANGEOUT WITH DUCTWORK |
| 2026-08-04 | 2026080074 | 28313 US 27 HY | Electrical | Install new 150 amp meter and main breaker panel. Wire in new circuits for ceiling... |
| 2026-08-04 | 2026080121 | 205 ALLYSON RD | Electrical | install new 150 amp over under service with breakers and grounding as needed. Same... |
| 2026-08-04 | 2026061276 | 32545 LAKESHORE DR | Addition | ADD A 144 SQ FT COVERED DOCK ADDITION TO THE EXISTING 854 SQ FT BOAT DOCK. |
| 2026-08-04 | 2026070258 | 33919 VALENCIA DR | Plumbing | Whole home repipe |
| 2026-08-04 | 2026080025 | 1005 SHAY BV 523 | Electrical | STANDARD PANEL REPLACEMENT 150 AMP--MAIN ZONE PANEL SURGE PROTECTION |
| 2026-08-04 | 2026080031 | 12504 SCOTTISH PINE LN | HVAC | 4 TON 10KW HVAC CHANGE OUT LIKE FOR LIKE |
| 2026-08-04 | 2026070334 | GREENTREE LN | Electrical | HOOKUP A 48KW GENERATOR WITH A 100AMP TRANSFER SWITCH. FOR WASTEWATER TREATMENT IN... |
| 2026-08-04 | 2026070438 | 3900 EDWARDS RD | Other | USED MOBILE HOME SET UP |
Query Lake County, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Lake County permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Lake%20County&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Lake County open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Lake County, Florida was issued on August 4, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Lake County permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Lake County, Florida is 2 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key