Access 123,198 building permits issued in Kissimmee, Florida through a single REST API. Refreshed daily from the official Kissimmee open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Kissimmee.
The 10 most recent permits issued in Kissimmee, Florida. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | PR-26-0411 | 5204 WORCHESTER | Plumbing | run plumbing in a new construction home |
| 2026-08-06 | PR-26-0410 | 4120 BELVEDERE | HVAC | run gas piping, 2 water heaters @ 199k each, 1 pool heater @ 400K total 3 drops ,... |
| 2026-08-06 | MSR-26-0402 | 4711 GOLDEN KNIGHT | Fence | Installation of a 6-foot-high white fence in the yard, totaling 142 linear feet: 5... |
| 2026-08-06 | PR-26-0412 | 5198 WORCHESTER | Plumbing | run plumbing in a new construction home |
| 2026-08-06 | BR-26-0936 | 5198 WORCHESTER | Roofing | Install shingles new construction |
| 2026-08-06 | BR-26-0933 | 5210 WORCHESTER | Roofing | Install shingles new construction |
| 2026-08-06 | MR-26-0388 | 1323 SWEETWOOD | HVAC | HVAC CHANGEOUT LIKE FOR LIKE NO DUCTWORK |
| 2026-08-06 | MSR-26-0403 | 4711 GOLDEN KNIGHT | Foundation | Paver installation for a 29' x 13' patio, plus an additional small 8' ... |
| 2026-08-06 | BC-26-0272 | — | New construction | New Triplex Residence |
| 2026-08-06 | BR-26-0939 | 5168 WORCHESTER | Roofing | Install shingles new construction |
Query Kissimmee, Florida permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Kissimmee permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Kissimmee&state=FL&issued_after=2026-04-01"
Related coverage in Florida and nationwide.
We ingest data directly from the official Kissimmee open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Kissimmee, Florida was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Kissimmee permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Kissimmee, Florida is 9 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key