PermitStack indexes 165,051 building permits issued in Aurora, Colorado, with 27,066 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.
Most common permit types issued in the last year.
The 10 most recent permits issued in Aurora, Colorado. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-05 | 26-2629538-000-00 | 13191 E KENTUCKY AVE | Roofing | -- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 19 SQS | | |
| 2026-06-05 | 26-2629757-000-00 | 6223 S JACKSON GAP CT | Plumbing | INSTALL WATER HEATER 50 GAL -- |COMMENTS: REPLACE WATER HEATER WITH 50 GALLON POWE... |
| 2026-06-05 | 26-2629644-000-00 | 16570 E BALTIC PL | Roofing | -- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 1 SQS | | |
| 2026-06-05 | 26-2629728-000-00 | 15825 E COLORADO AVE | Electrical | -- |COMMENTS: THE SERVICE IS UPGRADING TO 150 AMP| THE SERVICE TYPE IS PVC RISER| | |
| 2026-06-05 | 26-2629494-000-00 | 1744 S GENOA WAY | Plumbing | INSTALL WATER HEATER 40 GAL -- |COMMENTS: 40GAL 40K BTU WATER HEATER REPLACEMENT. | |
| 2026-06-05 | 26-2629496-000-00 | — | Electrical | XCEL ENERGY - BORE 70LF AND INSTALL 2 2" CONDUIT FOR ELECTRICAL DISTRUBUTION |
| 2026-06-05 | 26-2629627-000-00 | 11904 E CORNELL CIR | Plumbing | INSTALL WATER HEATER 40 GAL |
| 2026-06-05 | 26-2629521-000-00 | 12846 E NEVADA CIR | Electrical | INSTALL AC ONLY --|STATE ELECTRICAL LICENSE: 021132 | -- |COMMENTS: INSTALLING SW... |
| 2026-06-05 | 26-2629622-000-00 | 26042 E ORCHARD DR | HVAC | BUILDINGONLINE | 96% AFUE 115K BTU FURNACE REPLACE, 19 SEER2 5 TON HEAT PUMP FOR A... |
| 2026-06-05 | 26-2629591-000-00 | 16081 E LOYOLA PL | Electrical | INSTALL AC ONLY --|STATE ELECTRICAL LICENSE: 010183 | |
Query Aurora, Colorado permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Aurora permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Aurora&state=CO&issued_after=2026-04-01"
Related coverage in Colorado and nationwide.
We ingest data directly from the official Aurora open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Aurora, Colorado was issued on June 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Aurora permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Aurora, Colorado is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key