Access 138,781 building permits issued in Palm Springs, California through a single REST API. Refreshed daily from the official Palm Springs open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Palm Springs.
Most active contractors by permit volume in Palm Springs.
The 10 most recent permits issued in Palm Springs, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | BLDR-2026-1325 | 2716 SUNRISE SONATA | Other | Window change out |
| 2026-08-06 | BLDSIMP-2026-0951 | 3155 RAMON | Electrical | replace and relocate 100 amp zinsco panel |
| 2026-08-06 | BLDR-2026-1326 | 2695 WHITEWATER CLUB | HVAC | Change out HVAC |
| 2026-08-06 | BLDSIMP-2026-0943 | 3155 RAMON | Electrical | replace and relocate 100 amp zinsco panel |
| 2026-08-06 | BLDR-2026-1329 | 2716 SUNRISE SONATA | Other | Partial Window change out |
| 2026-08-06 | BLDR-2026-1330 | 290 SAN JACINTO | Plumbing | 2 vanity replacements |
| 2026-08-06 | BLDC-2026-0458 | 960 PALM CANYON | Renovation | Removed existing cabinets, flooring, tile, rotted framing, damage drywall. Repair ... |
| 2026-08-06 | PLDRAIN-2026-0016 | 3405 LOMA VISTA | Plumbing | Pool drain for 8/6/2026. |
| 2026-08-06 | BLDC-2026-0461 | 311 SUNRISE | Plumbing | Repair of bathroom and closets walls |
| 2026-08-06 | BLDR-2026-1324 | 116 VIBE | Other | Window change out due to cracked frames. Energy star yes |
Query Palm Springs, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Palm Springs permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Palm%20Springs&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Palm Springs open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Palm Springs, California was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Palm Springs permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Palm Springs, California is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key