Access 8,792 building permits issued in El Cajon, California through a single REST API. Refreshed daily from the official El Cajon open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in El Cajon.
Most active contractors by permit volume in El Cajon.
The 10 most recent permits issued in El Cajon, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | BP-2026-0402 | 1756 WELD | Electrical | THE SCOPE OF WORK CONSISTS OF 545 SQ FT ARGON TANK ADDITION IN |
| 2026-08-06 | PL-2026-0112 | 1374 SADDLEVIEW | Plumbing | INSTALL 2-WAY CLEANOUTS IN FRONT YARD |
| 2026-08-06 | BP-2026-0401 | 391 EL MONTE | Addition | Addition to single family residence. Bedroom and 3/4 bath |
| 2026-08-06 | PL-2026-0113 | 108 DOUGLAS | Plumbing | Licenced plumber repaired a gas leak and pressure tested it to 15LBS |
| 2026-08-06 | OTCWH-2026-0180 | 2502 BROWN | Plumbing | Replace Water Heater (Tank). |
| 2026-08-06 | MC-2026-0134 | 165 WESTWIND | Mechanical | REPLACE 5-ton A/C - LEFT SIDE YARD, COIL |
| 2026-08-06 | PL-2026-0111 | 583 ANN | Plumbing | INSTALL TANKLESS WATER HEATER W/ DESIGNATED GAS LINE |
| 2026-08-06 | MC-2026-0133 | 1087 PINE | Mechanical | REPLACE 4-ton A/C - RIGHT SIDE YARD, COIL, REPLACE FAU (80k BTUs) - CLOSET, W/DUCT... |
| 2026-08-06 | OTCWH-2026-0179 | 1377 BLUEBELL | Plumbing | Replace Water Heater (Tank). |
| 2026-08-06 | MC-2026-0136 | 422 ALDWYCH | HVAC | Install Split Heat Pump, Coil and Air Handler. |
Query El Cajon, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all El Cajon permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=El%20Cajon&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official El Cajon open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for El Cajon, California was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter El Cajon permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in El Cajon, California is 21 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key