Access 13,700 building permits issued in Phoenix, Arizona through a single REST API. Refreshed daily from the official Phoenix open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Phoenix, Arizona. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-05 | BLDR260448 | — | Electrical | Replace existing 200 amp service with new 200 amp service |
| 2026-06-05 | BLDR260447 | 12605 W STATE CT | Electrical | permit for electrical clearance only, [ |
| 2026-05-05 | BLDR260354 | 8941 E Minnesota AVE | Other | Replacement of gas shut off valve behind gas stove. |
| 2026-05-05 | BLDR260356 | 12725 E CLOUD RD | Electrical | Like for like 200AMP panel upgrade |
| 2026-05-01 | BLDR260343 | 15608 W SENTINEL DR | Other | INSTALLATION OF PV BATTERY STORAGE (2) TESLA POWERWALL 3 WITH 27 kWh PV STORAGE CA... |
| 2026-04-22 | BLDR260313 | 13213 W SERENADE CIR | Electrical | 200 amp panel replacement same location |
| 2026-04-16 | BLDR260299 | 10301 W KINGSWOOD CIR | Renovation | MAIN PANEL UPGRADE - 125AMP TO 150AMP |
| 2026-04-13 | BLDR260288 | 21427 N PALM DESERT DR | Other | 200A Like for Like Panel Replacement |
| 2026-04-07 | BLDR260272 | 16206 N ORCHARD HILLS DR | Other | Meter Clearance |
| 2026-04-07 | BLDR260270 | 18810 E MESCALERO DR | Electrical | 200amp like for like main panel swap out. general maintience |
Query Phoenix, Arizona permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Phoenix permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Phoenix&state=AZ&issued_after=2026-04-01"
Related coverage in Arizona and nationwide.
We ingest data directly from the official Phoenix open data portal (ArcGIS Hub) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Phoenix, Arizona was issued on June 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Phoenix permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Phoenix, Arizona is 23 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key