Access 46,904 building permits issued in Chandler, Arizona through a single REST API. Refreshed daily from the official Chandler open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Chandler.
Most active contractors by permit volume in Chandler.
The 10 most recent permits issued in Chandler, Arizona. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | BLD26-1971 | 5467 W CINDY PL | Other | 2 ALUMAWOOD PERGOLAS |
| 2026-08-06 | LFP26-0187 | — | Other | INTEL CH4 - SOW#12032-CPK01 - MECHANICAL * STRUCTURAL - CONTAINS THE SCOPE FOR STR... |
| 2026-08-06 | BLD26-1973 | S GILBERT RD & E RIGGS RD | Electrical | REPLACE EXSITNG 200AMP PANEL WITH NEW 400AMP ALL IN ONE PANEL. SAME LOCATION. OW... |
| 2026-08-06 | LFP26-0186 | — | Other | INTEL CH4 - SOW#12032-CPK002- ARCHITECTURAL RESTORATION, CEILINGS, FLOORING, DOOR... |
| 2026-08-06 | BLD26-1974 | E OCOTILLO RD & S MCQUEEN RD | Pool | CONSTRUCTON OF 27'6x15' (389 S.F.) INGROUND SWIMMING POOL W/ STANDARD POO... |
| 2026-08-06 | BLD26-1978 | COOPER RD/ RIGGS RD | HVAC | INSTALL POOL 30'X15', 405 SF WITH +18" CMU WATER FEATURE WALL; SPA 6&... |
| 2026-08-06 | BLD26-1972 | W RAY RD & N 54TH ST | Fire alarm | FIRE ALARM TI: REPLACE EXISTING DIALER WITH A CELLULAR DIALER |
| 2026-08-06 | BLD26-1980 | E Germann Rd. / S Mustang Dr | Electrical | Replacing old pool circuit that quit working. |
| 2026-08-06 | BLD26-1970 | MCQUEEN RD & CHANDLER HEIGHTS RD | Electrical | INSTALLING A NEW EV CHARGING CIRCUIT |
| 2026-08-06 | BLD26-1977 | 1412 W EL MONTE PL | Plumbing | CONVERTING TUB TO TUB, REPLACING PAN, DRAIN, AND VALVES. |
Query Chandler, Arizona permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Chandler permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Chandler&state=AZ&issued_after=2026-04-01"
Related coverage in Arizona and nationwide.
We ingest data directly from the official Chandler open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Chandler, Arizona was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Chandler permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key